Poglej vse

English različico upoštevajte kot našo uradno različico.Vrnitev

Evropa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Azija/Tihi ocean
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrika, Indija in Bližnji vzhod
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Južna Amerika / Oceanija
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Severna Amerika
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
DomovIzdelkiRazvojni Table, kompleti, programerjiOcenjevalne plošče - DC/DC & amp;SMPS AC/DC (zunaj line)TPS563202EVM
TPS563202EVM Image
Slika je lahko reprezentacija.
Glej specifikacije za podrobnosti izdelka.
EXPRESS MOžNOST
Način plačila

TPS563202EVM - Texas Instruments

Proizvajalec Številka dela
TPS563202EVM
Proizvajalec
Texas Instruments
Allelco Številka dela
98D-TPS563202EVM
Garancija
1 leto garancija Allelco - Izvedite več
Opis delov
4.5-V TO 17-V INPUT, 3-A, SYNCHR
Paket
Box
Podatkovni list
-
Naše potrdilo
Na zalogi: 33450
  • Cena na enoto: $73.50
  • Vmesni seštevek: $0.00

Želite boljšo ceno?
Dodaj v košarico in Pošlji RFQ Zdaj vas bomo takoj kontaktirali.

Količina Cena na enoto Ext.Cena
1+ $73.50 $73.50
Zgornje cene ne vključujejo davkov in stopenj tovora, ki bodo izračunane na straneh naročila.
EXPRESS MOžNOST
Način plačila
Naše potrdilo

Specifikacije

Tehnične specifikacije TPS563202EVM
Texas Instruments - TPS563202EVM Tehnične specifikacije, atributi, parametri in deli s podobnimi specifikacijami kot Texas Instruments - TPS563202EVM

Atribut izdelka Vrednost atributa  
Proizvajalec Texas Instruments  
Napetost - izhod 1.05V  
Napetost - Vhod 4.3V ~ 17V  
Uporabljena IC / del TPS563202  
Priložena vsebina Board(s)  
Serija -  
Topologija regulatorja Buck  
Atribut izdelka Vrednost atributa  
Paket Box  
Izhodi in tipi 1, Non-Isolated  
Glavni namen DC/DC, Step Down  
Frekvenca - preklop 600kHz  
Trenutni - izhod 3A  
Vrsta plošče Fully Populated  
Številka osnovnega izdelka TPS563202  

Okoljske in izvozne klasifikacije

ATRIBUT OPIS
Status RoHs Se ne uporablja
Raven občutljivosti vlage (MSL) 1 (Unlimited)
ECCN EAR99
HTSUS 8473.30.1180

Deli s podobnimi specifikacijami

Trije deli na desni imajo podobne specifikacije kot Texas Instruments TPS563202EVM.

Atribut izdelka TPS563202EVM 1023500000 0505Y1000330JQT
Številka dela TPS563202EVM 1023500000 0505Y1000330JQT
Proizvajalec Texas Instruments Weidmüller Knowles Syfer
Izhodi in tipi 1, Non-Isolated - -
Glavni namen DC/DC, Step Down - -
Napetost - Vhod 4.3V ~ 17V - -
Paket Box Bulk Tape & Reel (TR)
Številka osnovnega izdelka TPS563202 - 0505Y
Uporabljena IC / del TPS563202 - -
Frekvenca - preklop 600kHz - -
Trenutni - izhod 3A - -
Vrsta plošče Fully Populated - -
Topologija regulatorja Buck - -
Priložena vsebina Board(s) - -
Napetost - izhod 1.05V - -
Serija - W FlexiCap™

Ocene strank

Ocenjevanje: 10 Članki

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Napišite pregled

Vaš e -poštni naslov ne bo objavljen.

Pošiljka

Čas dostave

Predmeti v zalogi lahko pošljete v 24 urah.Nekateri deli bodo dogovorjeni za dostavo v 1-2 dneh od datuma, da vsi predmeti prispejo v naše skladišče.In ladje Allelco naročijo enkrat na dan okoli 17. ure, razen v nedeljo.Ko je blago odposlano, je predviden čas dostave odvisen od načina pošiljanja in cilja dostave.Spodnja tabela je logistični čas za nekatere skupne države.

Stroški dostave

  1. Če ga imate, uporabite svoj ekspresni račun za pošiljanje.
  2. Uporabite naš račun za pošiljko.Za približne stroške glejte spodnjo tabelo.
(Različni časovni okvir / države / velikost paketa ima različne cene.)

Način dostave

  1. Globalna skupna pošiljka DHL / UPS / FEDEX / TNT / EMS / SF Podpiramo.
  2. Drugi več načinov pošiljanja, prosim, stopite v stik s svojim upraviteljem strank.

Skupne države logistično referenco
Regija Država Logistični čas (dan)
Amerika ZDA 5
Brazilija 7
Evropa Nemčija 5
Združeno kraljestvo 4
Italija 5
Oceanija Avstralija 6
Nova Zelandija 5
Azija Indija 4
Japonska 4
Bližnji vzhod Izrael 6
Referenca za odplačilo DHL & FedEx
Stroški pošiljke (kg) Referenca DHL (USD)
0,00kg-1,00kg 30,00 USD - 60,00 USD
1,00kg-2,00kg 40,00 USD - 80,00 USD
2,00kg-3,00kg 50,00 USD - 100,00 USD
Opomba:
Zgornja tabela je namenjena samo referenci.Za nenadzorovane dejavnike ima lahko nekaj podatkovnih pristranskosti.
Če imate kakršna koli vprašanja, nas kontaktirajte.

Podpora za plačilo

Način plačila je mogoče izbrati iz spodnjih metod: prenos žic (T/T, bančni prenos), Western Union, kreditna kartica, PayPal.

Vaš verni partner dobavne verige -

Če imate kakršna koli vprašanja, nas kontaktirajte.

  1. Telefon
    +00852 9146 4856

Potrdila in članstvo

Poglej več
TPS563202EVM Image

TPS563202EVM

Texas Instruments
98D-TPS563202EVM

Želite boljšo ceno? Dodaj v košarico in Pošlji RFQ Zdaj vas bomo takoj kontaktirali.

0 RFQ
Nakupovalni voziček (0 Items)
Je prazno.
Primerjajte seznam (0 Items)
Je prazno.
Povratne informacije

Vaše povratne informacije so pomembne!Pri Allelco cenimo uporabniško izkušnjo in si prizadevamo, da bi jo nenehno izboljševali.
Prosimo, da svoje komentarje delite z nami prek našega obrazca za povratne informacije in takoj se bomo odzvali.
Hvala, ker ste izbrali Allelco.

Tema
E-naslov
Komentarji
Captcha
Povlecite ali kliknite za nalaganje datoteke
Naloži datoteko
Vrste: .xls, .xlsx, .doc, .docx, .jpg, .png in .pdf.
Max File Velikost: 10MB